A 14-month data centre exit, finished with six weeks to spare
National logistics operator · 380 servers · two co-location facilities · eleven waves
- Delivered six weeks before lease expiry
- Infrastructure run-rate down 31%
- No P1 in the eight months since go-live
$1.9M of annual AWS waste, found and structurally removed
Financial services platform · ~$6M annual AWS spend · 40+ accounts
- $1.4M realised in the first six months
- Untagged spend from 41% to 3%
- First saving landed on day nine
From “we think we're compliant” to an evidence pack in ten weeks
SaaS platform · IRAP readiness · ISO 27001 certification path
- IRAP assessment commenced with no blocking findings
- 63 long-lived IAM keys reduced to zero
- Essential Eight maturity Level 1 → Level 2
Shorter engagements
Not everything needs a retainer or a twelve-month programme.
Peak trading readiness
Load-tested and re-architected the checkout path ahead of a national sale event. Handled 7.4× baseline traffic with no degradation, and infrastructure cost returned to baseline within 48 hours of peak — the part most peak-readiness projects forget to design for.
On-call handover
Took first-line paging from a nine-person engineering team in three weeks. Alert volume cut 68% through hygiene work before we accepted the pager. Two engineers who had been carrying most of the rotation are still there a year later.
Tested disaster recovery
Rebuilt backup and cross-region strategy against RTO/RPO agreed with the business rather than assumed by IT, then ran a live regional failover. Recovery achieved in 41 minutes against a 4-hour commitment.
What you will not find on this page
- Percentages without a baseline. If we say 31%, the page says 31% of what.
- Outcomes we did not measure. Where a number is an estimate, we label it one.
- Quotes we wrote ourselves. Every quote here was said by a named person who approved its use.
- The engagements that went badly being quietly omitted — we will talk about those in a meeting if you ask, and you should ask.
“The wave plan was the first artefact that made the whole estate feel knowable. After that it was just execution.”
Your situation is probably on this page
Tell us which one, and we will tell you what the first ninety days would look like for you.